Now that the digging was done (at least in the hole), it was time to make sure all the sides were more or less level. The sides that I had driven the excavator over had sunk a bit making the 4x6 edges out of level. They would need to be shimmed up to allow the additional layer of 4x4s that I add in the winter for the ice to fit right. If the sides are out of level there would be gaps between the boards allowing water to escape and making it very difficult to make ice. Additionally the ice would appear to "slant" as one side of the frame would be lower than the other. It was off again to Lowes to get some bricks and landscaping fabric. While shopping for bricks, a lady came up to me and told me that they were cheaper at Home Depot. I bought the landscaping fabric and went to Home Depot. Indeed the bricks were cheaper and in addition, their previously-sold out stock of landscaping fabric had been replenished. I bought landscaping fabric from them too. I'll have to return the ones I bought from Lowe's later.
Andrew and I got back into the yard and started leveling the pit board by board. We started at the corner with the entry to the deck and moved around the court board-by-board making sure that all was level. The far end was out of level by more than two inches! After checking level, we shimmed the joints of the boards by digging out and placing two cinder blocks and a brick under them for added support. Hopefully this will prevent settling later on.
What was the cost of the sand? We live in Wa state and are afraid of what the cost of sand would be. Thank you!
ReplyDelete